Hot Water Boiler 1000Kg With Waste Wood Fuel
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
PREMIX CARPET 16.30 Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : 16.30.1 On W.B.M. @ 0.75 Kg / sqm sqm 45.20 16.30.2 On Get Price
Dec 10, 2021 · The water heating is achieved by way of a central natural gas boiler system located in the lowest basement and circulated around the building for …Get Price
Jun 04, 2020 · Boiler. A woman who is well past her prime. An old, decrepit, lady. 20 year old bloke to prostitute: Yeah, nah I don't mean to be rude but mate you're a straight-up boiler. You should be payin' me. Boil-over. A sporting upset, usually unexpected, resulting in a 'boil-over' of media mocking and pressure.Get Price
PREMIX CARPET 16.30 Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : 16.30.1 On W.B.M. @ 0.75 Kg / sqm sqm 45.20 16.30.2 On Get Price
PREMIX CARPET 16.30 Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : 16.30.1 On W.B.M. @ 0.75 Kg / sqm sqm 45.20 16.30.2 On Get Price
Dec 10, 2021 · The water heating is achieved by way of a central natural gas boiler system located in the lowest basement and circulated around the building for …Get Price
Dec 10, 2021 · The water heating is achieved by way of a central natural gas boiler system located in the lowest basement and circulated around the building for …Get Price