Bhel High Pressure Boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Bhel High Pressure Boilers
  • Supply Capacity : 10 units/month :Bhel High Pressure Boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Thermal Power Plant – Basic, Definition, Parts, Working

    Water is transferred to boiler which is normally kept at high level, hence, high head of pump with high work input is required. High pressure is developed in the water. Process-2: Heat Addition in boiler at Constant Pressure (Point 2-3) High pressure water enters into the boiler and heated through the furnace at constant pressure.Get Price

  • Thermal Power Plant – Basic, Definition, Parts, Working

    Water is transferred to boiler which is normally kept at high level, hence, high head of pump with high work input is required. High pressure is developed in the water. Process-2: Heat Addition in boiler at Constant Pressure (Point 2-3) High pressure water enters into the boiler and heated through the furnace at constant pressure.Get Price

  • Search - ntpctender.ntpc.co.in

    overhaul of boiler pressure parts (pass-1&2), overhaul of high pressure valves in boiler,online pressure setting of safety valves,hp jet cleaning of boiler components & aph baskets and biennial maintenance works in kstps stg-1,2&3 boiler pressure parts (2022- …Get Price

  • Tender - cspc.co.in

    Design, Engineering, Commissioning, Supply & Dosing application of desired quantity of Coal Additive [Multifunctional combustion Catalyst (THERMACT or equivalent) for Coal] for unit no. 1 & 2, 210 MW BHEL Boilers of HTPS, Korba (West) 4,97,000/-31.12.2021 Up to 3.00 Hrs. 03.01.2022. at 11.30 Hrs. NIT : C.E (Civil), CSPGCL, RAIPURGet Price

  • ASTM A106 Grade B Pipe, A106 Gr B Erw Pipe, SA106 Material

    Exporters of SA106 Material, ASTM A106 Seamless Pipe, A106 Gr B Erw Pipe. ASTM A106 Grade B Pipe is used in power plants, boilers, petrochemical plants, oil and gas refineries, and ships where the piping must transport hot or cold liquids and gases under high pressures and temperatures.A106 GR. B Carbon Steel Seamless Pipes, A106 Gr B Sch 40 pipe, ASTM A106 …Get Price

  • Thermal Power Plant – Basic, Definition, Parts, Working

    Water is transferred to boiler which is normally kept at high level, hence, high head of pump with high work input is required. High pressure is developed in the water. Process-2: Heat Addition in boiler at Constant Pressure (Point 2-3) High pressure water enters into the boiler and heated through the furnace at constant pressure.Get Price

  • History of BHEL | Official Website of Bharat Heavy

    Jul 26, 2021 · The first one was at Tiruchirappalli (Tamil Nadu) for high pressure boilers, the second one at Hyderabad (Telangana) for steam turbo generators and high pressure pumps and compressors - both of these with collaboration from Czechoslovakia and the third plant at Haridwar (Uttarakhand) with erstwhile USSR collaboration for large steam turbo generating …Get Price

  • Search - ntpctender.ntpc.co.in

    overhaul of boiler pressure parts (pass-1&2), overhaul of high pressure valves in boiler,online pressure setting of safety valves,hp jet cleaning of boiler components & aph baskets and biennial maintenance works in kstps stg-1,2&3 boiler pressure parts (2022- …Get Price

  • ASTM A106 Grade B Pipe, A106 Gr B Erw Pipe, SA106 Material

    Exporters of SA106 Material, ASTM A106 Seamless Pipe, A106 Gr B Erw Pipe. ASTM A106 Grade B Pipe is used in power plants, boilers, petrochemical plants, oil and gas refineries, and ships where the piping must transport hot or cold liquids and gases under high pressures and temperatures.A106 GR. B Carbon Steel Seamless Pipes, A106 Gr B Sch 40 pipe, ASTM A106 …Get Price

  • History of BHEL | Official Website of Bharat Heavy

    Jul 26, 2021 · The first one was at Tiruchirappalli (Tamil Nadu) for high pressure boilers, the second one at Hyderabad (Telangana) for steam turbo generators and high pressure pumps and compressors - both of these with collaboration from Czechoslovakia and the third plant at Haridwar (Uttarakhand) with erstwhile USSR collaboration for large steam turbo generating …Get Price

  • ASTM A106 Grade B Pipe, A106 Gr B Erw Pipe, SA106 Material

    Exporters of SA106 Material, ASTM A106 Seamless Pipe, A106 Gr B Erw Pipe. ASTM A106 Grade B Pipe is used in power plants, boilers, petrochemical plants, oil and gas refineries, and ships where the piping must transport hot or cold liquids and gases under high pressures and temperatures.A106 GR. B Carbon Steel Seamless Pipes, A106 Gr B Sch 40 pipe, ASTM A106 …Get Price

  • Tender - cspc.co.in

    Design, Engineering, Commissioning, Supply & Dosing application of desired quantity of Coal Additive [Multifunctional combustion Catalyst (THERMACT or equivalent) for Coal] for unit no. 1 & 2, 210 MW BHEL Boilers of HTPS, Korba (West) 4,97,000/-31.12.2021 Up to 3.00 Hrs. 03.01.2022. at 11.30 Hrs. NIT : C.E (Civil), CSPGCL, RAIPURGet Price

  • History of BHEL | Official Website of Bharat Heavy

    Jul 26, 2021 · The first one was at Tiruchirappalli (Tamil Nadu) for high pressure boilers, the second one at Hyderabad (Telangana) for steam turbo generators and high pressure pumps and compressors - both of these with collaboration from Czechoslovakia and the third plant at Haridwar (Uttarakhand) with erstwhile USSR collaboration for large steam turbo generating …Get Price

  • Search - ntpctender.ntpc.co.in

    overhaul of boiler pressure parts (pass-1&2), overhaul of high pressure valves in boiler,online pressure setting of safety valves,hp jet cleaning of boiler components & aph baskets and biennial maintenance works in kstps stg-1,2&3 boiler pressure parts (2022- …Get Price

  • Tender - cspc.co.in

    Design, Engineering, Commissioning, Supply & Dosing application of desired quantity of Coal Additive [Multifunctional combustion Catalyst (THERMACT or equivalent) for Coal] for unit no. 1 & 2, 210 MW BHEL Boilers of HTPS, Korba (West) 4,97,000/-31.12.2021 Up to 3.00 Hrs. 03.01.2022. at 11.30 Hrs. NIT : C.E (Civil), CSPGCL, RAIPURGet Price

Discount
7X24 Online